Due to a general fault in the cooling equipment at internet exchange KN7.
Adminor will proactively failover our equipment to secondary network path.
This is to ensure that we can safely bring our equipment to power down status without causing unecessary service disruptions.
Update: At 00.00 Stokab suffered a failiure to their cooling equipment / VVS.
At 01.00 Adminor was notified of exceeded temperatures in our equipment. Customer traffic was re-routed to have minimal impact on connections.
At 02.20 Adminor was on-site to handle our equipment while sub-contractor worked on resolving the fault of the cooling equipment.
At 04.50 the systems were restored .
We will move customer traffic back to primary path at an emergency service window during out of office hours.